Recently Awarded Projects |
Nagpur Metro Rail Project |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has received a Letter of Acceptance (LoA) from Nagpur Metro Rail Corporation Limited (A Joint Venture of Government of India & Government of Maharashtra) for Rs. 532.67 Crores Nagpur Metro Rail Project. The Project involves construction of Seven Elevated Metro Stations, and Three At-Grade Stations (North South Corridor) viz. Congress Nagar to Khapri and Viaducts between Ch: 7/850 to 8/030 and Ch: 8/574 to 9/692 in Reach-1. The Project is to be completed in 110 weeks from the date of issue of Letter of Acceptance (LOA). |
Ongoing Projects |
Metro Rail Contract in Gujarat |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has received a Letter of Acceptance (LoA) regarding construction of metro rail project in Gujarat from Metro-Link Express for Gandhinagar & Ahmedabad (MEGA) Company Limited for Rs. 374.64 Crores. MEGA is a Special Purpose Vehicle (SPV) incorporated by the Government of Gujarat to implement Metro Rail Project under the Companies Act, 1956. The project involves construction of Viaduct Corridor from Interface Point with Gyaspur Depot, Abutment of Depot to APMC Metro Rail Station to Shreyas Metro Rail Station all inclusive of Elevated Viaduct portion from chainage (-)1374.50 to (+)3246.50 mts, and Elevated Metro Stations (4 numbers) viz. APMC, Jivraj, Rajivnagar, and Shreyas for Package-1 of North-South Corridor for Ahmedabad Metro Rail Project Phase-1. The Project is to be completed in 120 weeks from the date of issue of Letter of Acceptance (LOA). |
Bangalore Metro Rail Contract |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has bagged a metro rail contract from Bangalore Metro Rail Corporation Limited for a value of Rs. 326.99 Crores. The contract involves construction of elevated structures (viaduct) of length 3.945 km (approx) from Mysore Road Station dead-end to Pattanagere Station including 4 Nos. of elevated metro stations viz. Nayandahalli Station, Rajarajeshwari Nagar Station, Jnanabharathi Station, and Pattanagere Station in the west extension of E-W Corridor of Bangalore Metro Rail Project, Phase-2. The Project is to be completed in 27 months from the date of issue of Letter of Acceptance (LOA). |
RVNL Kolkata Elevated Metro Stations Contract |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has been awarded a contract by Rail Vikas Nigam Limited, Kolkata for a value of Rs.299.76 Crores towards construction of Seven Elevated Metro stations from Sub CBD-1 to Titumir in New Garia - Airport Metro Corridor of Kolkata Metro Line in the state of West Bengal. The Project is to be completed in 36 months from the date of issue of Letter of Acceptance (LOA). |
Construction of Elevated Stations for Rapid Metro Rail-Gurgaon (Phase II) |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) has won an order for construction of Elevated Stations for the Rapid Metro Rail Project, Phase-II (RMRG). This contract involves civil structural works for construction of (05) five elevated stations at DLF Phase-I, Sushant Lok, Sector 53-54, AIT Chowck, and Sector 55-56 in Gurgaon (South Extension) for RMRG (Phase II). The total value of the contract is Rs. 84.30 Crores, and is to be completed in 24 months. |
Construction of Railway Flyover for Dedicated Freight Corridor Corporation of India Limited (DFCCIL) |
IL&FS Engineering and Construction Company Limited (IL&FS Engineering Services) in joint venture with GPT Infraprojects Ltd. has received a Letter of Award (LoA) from Dedicated Freight Corridor Corporation of India Limited (DFCCIL) for the work of design and construction of rail flyover near Ganjkhwaja in Uttar Pradesh and formation in embankments/cuttings including blanketing, bridges (major, minor & RUBs), supply and spreading of ballast and other related infrastructural works for double track electrified railway line in different stretches between Dehri-on-Sone & Mughalsarai section of Eastern Dedicated Freight Corridor in the states of Bihar and Uttar Pradesh on Design Build Lump Sum basis. The total value of this project is Rs. 144.65 Crores, which is to be completed in 30 months. |
Construction of Elevated Viaduct for Rapid Metro Rail Gurgaon Limited (RMRG) at Gurgaon, Haryana (Phase II) |
IL&FS Engineering Services has received a Letter of Award (LoA) for construction of Elevated Viaduct for the Rapid Metro Rail Project, Phase-II (RMRG). This contract involves construction of single and double track Elevated Viaduct from chainage 15950m to 22650m (approximate) for Rapid Metro Rail Gurgaon Limited (RMGL), an SPV formed for the implementation of RMRG Project. The total value of this contract is Rs. 255.84 Crores, and the project completion period is 24 months. |
Doubling of Bhigwan – Mohol Section for Rail Vikas Nigam Limited on Central Railway Near Solapur |
IL&FS Engineering Services has been awarded a contract by Rail Vikas Nigam Limited, Mumbai for the construction of Roadbed, Major & Minor Bridges, Track Linking (excluding supply of rails, ordinary track sleepers and thick web switches), Outdoor Signalling and Electrical (General) works in connection with Doubling of Bhigwan – Mohol Section (127.14 Kms) part of Daund – Gulbarga Doubling in Solapur division of Central Railways in the state of Maharashtra, India. The Project is to be completed in 42 months from the date of commencement of work. The value of the contract is Rs. 158.01 crores. |
MRTS – Phase I & II in Southern Railway at Chennai IL&FS Engineering Services is executing the below MRTS works:
Value of these projects: Rs. 42.48 crores Doubling of BG Track Between Chengalpattu and Villupuram (Reach I, II, & III), Southern Railway IL&FS Engineering Services is executing proposed widening and re-grading of existing MG formation to BG standard, construction of Major Bridges, Station Building, S&T Accommodation, Level Crossing, Platform, Goods Platform, CC Apron, Platform Shelter, Foot Over Bridges, Circulating Area, Approach Road, Protective works Passenger Amenities, Watering Arrangements, Transportation of Staging materials etc., between Chengalpattu (including) and Villupuram (excluding), and also excluding all the works in Vikravandi & Muniyampakkam yard limits. The value of the contract is Rs. 110.96 crores Completed Works RMRG (Phase I) - Design & Construction of Elevated Viaduct (Single/Double Line) and Six Stations for Rapid Metro Rail Gurgaon Limited at Gurgaon, Haryana Mass Rapid Transit System (MRTS -Chennai) - Phase-II – Southern Railway, Chennai IL&FS Engineering Services was involved with MRTS-Phase-II-Extension from Velachery to St. Thomas Mount. The work involved construction of pile foundation and substructure consisting of cast-in-situ 1200mm dia bored piles, pile caps, piers and pier caps etc., and other miscellaneous works between ch.19.800 and ch. 21.050- Reach-I. This work was completed by MIL (now IL&FS ECCL)-CTR JV (70:30). The value of the project is Rs. 22.732 crores. The project was successfully completed on October 12, 2010. Mass Rapid Transit System (MRTS -Chennai) - Phase-II - Southern Railway, Chennai IL&FS Engineering Services was involved with MRTS-Phase-II-Extension from Velachery to St. Thomas Mount. The work involved construction of pile foundation and substructure consisting of cast-in-situ 1200mm dia bored piles, pile caps, piers and pier caps etc., and other miscellaneous works between ch.21.050 and ch. 22.050- Reach II. This work was completed by MIL (now IL&FS ECCL). The value of the project is Rs. 17.04 crores. The project was successfully completed on March 31, 2011. Construction of Boundary Wall & Other Depot Works for Byappanahalli Depot, Bangalore Metro Rail Corporation (BMRCL) |